
Vitamin– ‘C’ manufacturing is being
carried out in a dedicated manufacturing block. The
RCC civil structure has an area 7457
sft having a mezzanine floor with M.S sheets and painted
with rust proof paint and the top
roof is made up of GI metal sheets. The flooring is
cement concreted / M.S. Sheets, false
ceiling was incorporated in the product pharma areas
to cover the utilities.
Infrastructure:
 The
facility includes a wide range of process equipment
that allows up to 100 MT of commercial production
under cGMP guidelines.
 The
production Block fully equipped with glass lined &
stainless steel reactors and agitated VAT with
a total capacity of 79 KL. |